MACH7 - References
The retrofit of the power stations in Ahrensfelde and Thyrow are the most extensive modernization of a General Electric power plant in Europe.
With this project, we brought a majority of our products to use and the owner took advantage of our many years of experience. All past tests and operating scenarios were successfully completed and speak for the quality of our development.
We heartily welcome you to a presentation at the Vattenfall Power Station near Berlin.
References – Mach 7 Turbine Control System
Installed Systems: 21
Installed Power: About 667 MW at ISO
Peak Load Power: About 667 MW at ISO
Characteristics: Approved and used for black start and net reconstruction

E.ON Westfalen Weser Energie Service GmbH / Germany, Kirchlengern 2009
Control System ITS Mach 7
Turbine Type 1 x GE MS5001 (PG5341)
Fuel System Gas, Fuel oil
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Retrofit for GE Speedtronic Mark II
Additional Work Scope:
- New synchronizer
- New protection system
- New MCC
- Modernization of all field devices
- Complete new wiring
- Redundant pressure/temperature transmitter measurements instead of switches
EnBW Kraftwerke AG / Germany, Stuttgart 2008-2009
Control System ITS Mach 7
Turbine Type 1 x Auxiliary plant
Fuel System Fuel Oil
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Retrofit for GE Speedtronic Mark II
Additional Work Scope:
- Automation of human machine interfaces
- Implementation of plant control
- Implementation of fuel monitoring
- Implementation of the fire fighting system
- Modernization of field devices
- New wiring
- Redundant pressure/temperature transmitter measurements instead of switches

EnBW Kraftwerke AG / Germany, Stuttgart 2008-2009
Control System ITS Mach 7
Turbine Type 3 x GE MS5001 (PG5341)
Fuel System Fuel Oil
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Retrofit for Various old PLC systems
Additional Work Scope:
- New synchronizer
- New protection system
- New MCC
- Modernization of all field devices
- Complete new wiring
- Redundant pressure/temperature transmitter measurements instead of switches

Stadtwerke Duisburg AG / Germany, Duisburg 2006
Control System ITS Mach 7
Turbine Type 1 x Auxiliary plant
Fuel System Gas, Fuel oil
DCS ITS TMOS, Siemens WinCC
Used for Peak load
Minute reserve (fast start)
Long distance heating
Retrofit for Siemens Iskamatic
Additional Work Scope:
- Automation of human machine interfaces
- Implementation of plant control
- Implementation of fuel monitoring
- Modernization of field devices
- New wiring
- Redundant pressure/temperature transmitter measurements instead of switches
Stadtwerke Duisburg AG / Germany, Duisburg 2006
Control System ITS Mach 7
Turbine Type 1 x Siemens V82.0 dual fuel
Fuel System Gas, Fuel oil
DCS ITS TMOS, Siemens WinCC
Used for Peak load
Minute reserve (fast start)
Long distance heating
Retrofit for Siemens Iskamatic
Additional Work Scope:
- New synchronizer
- Additional temperature measurements
- Modernization of all field devices
- AUMA devices
- Complete new wiring
- New high pressure hydraulic system
- Redundant pressure/temperature transmitter measurements instead of switches
Vattenfall Europe AG / Germany, Ahrensfelde 2005-2006
Control System ITS Mach 7
Turbine Type 1 x Auxiliary plant
Fuel System Dual fuel
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Retrofit for GE PLC
Additional Work Scope:
- Automation of human machine interfaces
- Implementation of plant control
- Implementation of fuel monitoring
- Implementation of the waste water system
- Implementation of the firefighting system
- Implementation of the heating system
- Inst. Intrusion detection System
- Installation of a plant video surveillance
- Modernization of field devices
- New wiring
- Redundant pressure/temperature transmitter measurements instead of switches
Vattenfall Europe AG / Germany, Thyrow 2005-2006
Control System ITS Mach 7
Turbine Type 1 x Auxiliary plant
Fuel System Dual fuel
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Retrofit for GE PLC
Additional Work Scope:
- Automation of human machine interfaces
- Implementation of plant control
- Implementation of fuel monitoring
- Implementation of the waste water system
- Implementation of the firefighting system
- Implementation of the heating system
- Inst. Intrusion detection System
- Installation of a plant video surveillance
- Modernization of field devices
- New wiring
- Redundant pressure/temperature transmitter measurements instead of switches
Vattenfall Europe AG / Germany, Ahrensfelde 2005
Control System ITS Mach 7
Turbine Type 4 x GE MS6001B dual fuel
Fuel System Gas
DCS ITS TMOS
Used For Peak load
Minute reserve (fast start)
Retrofit For GE Speedtronic Mark IV
Additional Work Scope:
- New synchronizer
- Temp. switches replaced by PT100
- Pressure switches replaced by transmitter.
- Additional vibration sensors
- RTDs PT100 at load gear
- Control drive for anti-icing
- Control drive for lube oil cooling
- Control drive for atomization air cooling
- Control drive for generator flaps
- New wiring
- Variable fast start
Vattenfall Europe AG / Germany, Thyrow 1 2004-2005
Control System ITS Mach 7
Turbine Type 4 x GE MS6001B dual fuel
Fuel System Gas, Fuel oil
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Black start
Net reconstruction
Retrofit for GE Speedtronic Mark II
Additional Work Scope:
- New synchronizer
- Lube oil PT100 press. switches removed
- Additional vibration sensors
- RTDs PT100 at load gear
- Control drive for anti-icing
- Control drive for lube oil cooling
- Control drive for atomization air cooling
- Control drive for generator flaps
- New wiring
- Variable fast start
Vattenfall Europe AG / Germany, Thyrow 2 2004-2005
Control System ITS Mach 7
Turbine Type 4x GE MS6001B dual fuel
Fuel System Gas, Fuel oil
DCS ITS TMOS
Used for Peak load
Minute reserve (fast start)
Black start
Net reconstruction
Retrofit for GE Speedtronic Mark IV
Additional Work Scope:
- New synchronizer
- Lube oil PT100 press. switches removed
- Additional vibration sensors
- RTDs PT100 at load gear
- Control drive for anti-icing
- Control drive for lube oil cooling
- Control drive for atomization air cooling
- Control drive for generator flaps
- New wiring
- Variable fast start